Good to see you!
Otherwise login by email.
Welcome to Dulux
Otherwise login by email.
Terms and Conditions
Thanks!
Our latest tips and inspirations are on their way to your mailbox
Registration complete
Forgotten your password?
Please enter email address associated to your account
Password changed successfully
We successfully updated your personal details.
Forgotten your password?
For more tailored inspiration, please fill in the 3 questions below.
Thanks for registering
We will send you colourful news every now and then
Delete Account
Dulux Aquatech Repair Pro Latex
-
Finish N/A
-
Coverage Not Applicable
-
Drying Time Brush apply 2 coats on the concrete in a span of 4-6 hours
-
Coats 1
-
High water resistance
Product Description
Application Description
• For repair mortar, please follow the below ratio of mixing
• 50 kg cement: 150 kg washed sand: 6-7.5 kg of additive: 10 lit water.
As a waterproofing coat
• Mix the additive with the cement in the ratio 1: 2 by weight.
• Mix for 2-3 mins to avoid air entrapment, add cement to the additive till a good consistency is achieved.
• Brush apply 2 coats on the concrete in a span of 4-6 hours. This can be used in areas like below the tiling areas in bathroom or sunken areas, small balconies, chajjas and parapet walls.
• Overlay with protective screed for the desired slope and thickness.
As a Bond Coat
• Mix Repair Pro Latex with Cement in the ratio of 1:1 by weight.
• Add cement into the additive and then stir slowly till homogeneity is achieved.
• Apply 1 coat to the prepared concrete substrate.
• Overlay with repair mortar when the bond coat is still wet/tacky.
As a Concrete repair
• Use the below mentioned ratio for preparing repair mortars for concrete beams, columns, chajjas, parapet walls
• Portland cement: 50 kg, Washed sand: 75 kg,6mm Aggregates: 75 kg, Additive- 6-7.5 kg, Water 10 lit
Curing and Maturation
• The standard maturation practices for concrete columns, beams, chajjas and parapet walls needs to be maintained even while using the additive.
• For waterproofing of low areas like below the bathroom tiles, or sunken areas, it is essential to provide 1-2 days of setting time for a proper solution.
Health & Safety
Tips & Advice
-
1. CleaningClean painting equipment immediately after use and dry
-
2. StoringObserve the label precautions. Store in a cool, dry, well ventilated place away from sources of heat, ignition and direct sunlight. No smoking. Prevent unauthorised access. Containers which are opened should be properly resealed and kept upright to prevent leakage. Do not use or store any paint container by hanging on a hook.
How much paint do I need?
More than one wall to paint? Try our advanced paint calculator
Measure the height and length of the surface you want to paint (in metres or centimetres).
Your Measurements:
{{!-- This value will be injected with JavaScript --}}
Amount needed:
{{!-- This value will be injected with JavaScript --}}
This is an estimated based on 2 coats. Actual coverage will depend on the conditions of the surface. If the colour change is strong, more coats may be required.
Add a new job
Add a new job
Edit a job
Delete job
Are you sure? All notes, photos and saved items will be deleted.
Save colour
Save to My Workspace
Add to job
Dulux Aquatech Repair Pro Latex
Save job